Projects · Live deployments

The real deployments, live on chain.

Pilot Node #1 in Dallas, Texas has been signing environmental data on Cardano since June 2024. 51,466 hardware-signed SaveCards, zero gaps, continuous. This is the current state of the network: what is live, what is in pilot, and what is next.

01 · Network status

Live, in pilot, exploratory.

One honest snapshot of where every deployment stands today. Live means signing data on chain right now. In pilot means a scoped site under active build. Exploratory means diligence, not yet committed.

Live

Pilot Node #1, Dallas, Texas. Hardware-signed SaveCards on Cardano, continuous since June 2024.

In pilot

Idaho enhanced rock weathering (ERW) pilot. Multi-node deployment for ERW carbon removal MRV under active build.

Exploratory

Genesis network expansion. 200 nodes planned, additional nodes targeted for Q1 2027 following mainnet migration.

02 · Pilot Node #1 · Dallas, Texas

Live on Cardano since June 2024.

The first Mālama node has been running in Dallas, Texas without interruption. It emits continuous, hardware-signed environmental telemetry, ECDSA-signed at the device, then anchored on chain as SaveCards. No gaps in the record.

51,466
Hardware-signed SaveCards
Zero
Gaps in the record
Jun 2024
Live on chain since
24/7
Continuous telemetry
Signed at the device

Ground truth

Every reading is signed in a tamper-resistant secure element the moment it is taken. Change one digit and the signature breaks. The chain of custody starts at the sensor.

Anchored on chain

SaveCards on Cardano

51,466 hardware-signed SaveCards recorded on Cardano, a continuous archive of field telemetry that a buyer, registry, or regulator can verify directly.

Continuous · zero gaps

Unbroken record

Running since June 2024 without interruption. Continuous soil, air, and device telemetry, so the record is complete rather than sampled after the fact.

03 · Idaho ERW pilot

Enhanced rock weathering, measured at the source.

Our second deployment is an enhanced rock weathering (ERW) pilot in Idaho. ERW draws down carbon as crushed silicate rock weathers in soil. The hard part is proving it, so this is a multi-node site built for continuous, hardware-signed measurement rather than after-the-fact estimation.

ERW carbon removal

MRV for weathering

A pilot site instrumented to monitor enhanced rock weathering carbon removal, with continuous soil chemistry captured on the same signing architecture as the Texas node.

Multi-node build

Signed soil chemistry

A cluster of nodes deployed for ERW MRV, extending the hardware-signed model from a single node to a full site so removal can be measured directly at the source.

04 · Roadmap

Genesis 200, then mainnet.

The path from one live node to a network. Milestones below are targets, sequenced behind a smart contract audit, and may shift as work and diligence progress.

Milestone Target Status
Pilot Node #1, Dallas, Texas Live on Cardano, June 2024 Live
Idaho ERW pilot Multi-node ERW MRV site In pilot
Genesis network 200 nodes In progress
Mainnet migration Q4 2026, post-audit Planned
Additional nodes Q1 2027 Planned

Mainnet migration follows a smart contract audit and is targeted for Q4 2026. Additional Genesis nodes are targeted for Q1 2027. Dates are current targets, not commitments.

05 · Get involved

Deploy a node, or verify the data.

Register interest to operate deployment infrastructure on the Genesis network, or talk to us about licensing verified environmental data.